Industrial Strength for Efficient Handling

 RIPPA forklifts improve the efficiency of cargo loading and unloading with their powerful lifting capacity and fast operating speed.

MODELS

Maxium lift weight: 2.2kg
Maximum lifting height:3m
voltage:60v

Vehicle dead weight:3700kg
Maximum lift weight:3000kg
Voltage:60v

Operating weight: 5000kg
Rated power: 61kw
Maximum lifting height:3m

Operating weight: 3000kg
Rated power: 37kw
Maximum lifting height:3m

Weight unload:7200kg
Maximum lift capacity:3500kg
Lift height:7000mm

Weight unload:7800kg
Maximum lift capacity:4000kg
Lift height:7000mm

Rated load:4000kg
Maximum lift height: 17550mm
Power:91kw

Work weight:500kg
Rated voltage:48v
Lift height:3m

Vehicle dead weight:2600kg
Maximum lift weight:1500kg
Voltage:60v

Vehicle dead weight:3100kg
Maximum lift weight:2500kg
Voltage:60v

Vehicle dead weight:3700kg
Maximum lift weight:3000kg
Voltage:60v

Vehicle dead weight:4200kg
Maximum lift weight:3500kg
Voltage:60v

Application Scenario

Storehouse
Logistics
Factory
3
Harbor Terminal

How to operate a forklift?

Following forklift safety best practices can help you avoid accidents.

  • Perform Pre-Operation Inspections
    Before using any type of forklift, always perform the necessary safety inspections for forklift operation.
  • Be Careful with Loads
    When operating a forklift,  be careful with the weight of the load. Make sure not to exceed the machine’s capacity. In addition to not overloading the forklift, be careful about how you move the load.
  •  Maintain Visibility
    Visibility is key to a safe workplace. Make sure your sight lines are unobstructed and be aware of other people, machines, and other workplace hazards while operating. Keep the forks low to the ground for maximum visibility while driving.

Benefits of Becoming a Rippa forklift Owner

Submit Your Requirements

Simply fill in the form and submit your requirements easily, we will contact you as soon as possible

Factory Direct Supply

We provide you with transparent quotes quickly and without hidden fees, so you can enjoy lower costs.

Signing a Contract

Quickly sign the supply contract to protect the rights and interests of both parties and ensure that the transaction is safe and reliable.

未标题 6

Efficient Logistics Network

After signing the contract, shipment will be arranged within 1 day to shorten the waiting time and ensure that the equipment arrives on time.

Professional Acceptance Service

After the equipment is delivered, we will provide you with full acceptance support to ensure that the product meets all standards and performance requirements of the contract.

After-sales Support

24-hour online, quick response, ensure long-term and efficient operation of the equipment.Take action now and start your worry-free purchasing journey!